Series

Deployables — the series

8 essays on one idea, from the one that introduces it to the one that assumes the rest.
  1. Miura solar array17×Space Flyer Unit, 1995airbag folding25×stored for years, opens in 30 msheart stentthreaded through an arterystarshade11×26 m disc, 2.5 m launch tubemap foldthe original problempackeddeployedthe ratio is what is bought; one degree of freedom is what makes it reliable

    Folding that gets built

    Solar arrays, airbags, stents and starshades. The requirement is always the same — large in use, small in transit, along a path nobody has to trust to chance — and folding is what answers it.

    part 1 · rigid
  2. Miura solar array17×Space Flyer Unit, 1995airbag folding25×stored for years, opens in 30 msheart stentthreaded through an arterystarshade11×26 m disc, 2.5 m launch tubemap foldthe original problempackeddeployedthe ratio is what is bought; one degree of freedom is what makes it reliable

    From a shell to a solar array

    The Miura fold was published in 1970 and flew on a satellite in 1995. The gap is not ignorance — the pattern was known, understood and available the whole time — and the same twenty-five year lag appears between every folding result and the hardware that uses it.

    part 2 · history
  3. the bar is sheet-widths of crease per layer of compactionshorter is a better exchange rate, and the order is nothing like the order aboveThe Yoshimura pattern0.2314.0 of crease · 60.0 layersThe waterbomb tessellation0.4514.3 of crease · 31.5 layersThe preliminary base0.604.8 of crease · 8.0 layersThe Miura fold0.676.2 of crease · 9.2 layersThe tapered corrugation0.796.6 of crease · 8.3 layersFold and cut — the triangle1.451.7 of crease · 1.2 layersThe square twist1.564.7 of crease · 3.0 layersThe hexagon twist1.886.1 of crease · 3.3 layersa corrugation pays less per layer than a base does, and the difference is not small

    Fourth of eight, and still not chosen for it

    A deployable is sold on compaction: large in use, small in transit. Measured, the pattern that actually gets built converts folding into compaction at 0.67 sheet-widths of crease per layer, which is fourth of the eight printed patterns — nearly three times worse than the Yoshimura, which nobody deploys, and nearly three times better than the hexagon twist, which nobody deploys either. The ranking does not pick out the pattern that flew from anywhere on the shelf, and that is the finding.

    part 3 · rigid
  4. Miura solar array17×Space Flyer Unit, 1995airbag folding25×stored for years, opens in 30 msheart stentthreaded through an arterystarshade11×26 m disc, 2.5 m launch tubepackeddeployedthe ratio is what is bought; one degree of freedom is what makes it reliable

    The tube that gets built

    Every folded structure that leaves a laboratory is a sheet joined to itself — a boom, a stent, a bellows, an airbag, a packed antenna. The mathematics has been done on flat rectangles for the whole history of the subject, and the object is a cylinder, which is a different sheet with different counts and a condition the rectangle does not have.

    part 4 · rigid
  5. folding, priced by how often it has to happena crease of radius ρ strains its outer fibre by t ⁄ 2ρ, and a material takes less strain the more often it is askedcycles it must survivesmallest hinge radiusbest fold countpacking it reachesagainst once10.05087.643.8100.15827.713.93× worse1000.5008.7604.38010× worse1,0001.5812.7701.38532× worsesheet 10, thickness 0.1, fatigue exponent 0.5 · the radius goes as N^0.5 and the packing as N^−0.5

    What a second deployment costs

    Every folded structure this field builds deploys once. The reason is a power law: a hinge asked to survive more cycles cannot be as sharp, a blunter hinge takes more surface out of the sheet, and the fold count that packs best falls as the cycle count to a fatigue exponent. A structure required to work a thousand times packs thirty times worse than one required to work once, and the exponent decides how fast rather than whether.

    part 5 · rigid
  6. what a finer pattern costs in confidenceeach hinge working 0.999 of the time, against a target of 99 per cent for the whole deploymenthingesthe system openseach hinge needssuccesses to show itand the article itself899.2%0.9987442,385cannot be tested2497.6%0.9995817,154cannot be tested6094.2%0.99983317,885cannot be tested12088.7%0.99991635,769cannot be tested30074.1%0.99996689,422cannot be testedr consecutive successes put a 95 per cent lower bound of 0.05^(1⁄r) on a hinge, and a flight article deploys once

    The crease count is a reliability budget

    A deployment that needs every hinge to work is the hinge reliability raised to the crease count, so the fineness that buys compaction spends the probability of getting it. At a thousandth of a chance of a hinge failing, sixty hinges give a 94 per cent deployment and three hundred give 74. The fold count that maximises expected compaction is well below the one that maximises compaction — and demonstrating the result takes tens of thousands of successful tests on an article that itself deploys once.

    part 6 · rigid
  7. one freedom, or severala stuck hinge or a failed actuator loses its own module and nothing elsemodulesall of it opensshare expectedat least 90%at least 75%173.3%73.3%73.3%73.3%272.6%85.2%72.6%72.6%570.4%93.2%70.4%96.0%1067.0%96.1%94.4%99.4%2060.6%97.5%98.7%100.0%5044.8%98.4%100.0%100.0%10027.1%98.7%100.0%100.0%300 hinges at 0.999 each, split evenly · each module's actuator works 0.99 of the time

    Splitting a sheet buys area, not certainty

    A folded deployable with one freedom needs every hinge and its one actuator, and three hundred hinges at 0.999 each open all the way 73 per cent of the time. Split the same hinges among ten separately driven modules and a stuck hinge costs only its own module: the share of the area expected to open rises to 96 per cent, and the chance of at least nine tenths of it rises to 94. The chance of all of it falls, to 67 per cent, because every freedom added is an actuator added. So freedoms, actuators and reliability trade in a definite way: one freedom is the best design only for a mission that is worthless without its whole area, and for any mission that can live with less, several freedoms win by a margin that no improvement in the hinges matches.

    part 7 · rigid
  8. tests needed for each layer of compaction, pattern by patterna test campaign grows with the hinge count, so the pattern with fewest hinges per layer is cheapest to trustpatternhingeslayersper layertests per layerby testsby lengthThe preliminary base88.01.002981st3rdThe Yoshimura pattern8660.01.434272nd1stThe waterbomb tessellation7631.52.417203rd2ndThe square twist123.03.981,1854th7thThe Miura fold389.24.121,2285th4thFold and cut — the triangle61.25.051,5056th6thThe tapered corrugation458.35.401,6117th5thThe hexagon twist183.35.541,6508th8thtests are consecutive successes demonstrating 99 per cent for the whole pattern at 95 per cent confidence

    The pattern cheapest to trust

    Demonstrating that a one-shot deployment will open takes a number of successful tests proportional to its hinge count, so the pattern that needs fewest tests for what it delivers is the one with fewest hinges per layer of compaction. That criterion is a count nobody computes, and computed on the printed shelf it ranks the patterns differently from crease length per layer: the preliminary base is first, at exactly one hinge per layer, and the square twist rises from seventh to fourth. As patterns are refined the difference sharpens. The waterbomb settles at 2.47 hinges a layer and the Yoshimura at 1.47, but the Miura climbs without levelling — 1.32 at two cells a side, 5.69 at eight — so every finer Miura costs more tests for each layer it adds, and the pattern that gets built is the only one of the three that gets dearer to trust as it gets finer.

    part 8 · rigid

All series