Concept

Reliability — where it appears

The probability that a mechanism does what it is for, once, when it is asked. A deployment needing every hinge to work is the hinge reliability raised to the crease count, which makes a pattern's fineness a budget spent out of the chance that it opens at all.

Named by 7 essays across one field — each of them below, with the objects they name alongside it.

Miura solar array17×Space Flyer Unit, 1995airbag folding25×stored for years, opens in 30 msheart stent6×threaded through an arterystarshade11×26 m disc, 2.5 m launch tubemap fold9×the original problempackeddeployedthe ratio is what is bought; one degree of freedom is what makes it reliable

Folding that gets built

Solar arrays, airbags, stents and starshades. The requirement is always the same — large in use, small in transit, along a path nobody has to trust to chance — and folding is what answers it.

rigid · Deployables
folding, priced by how often it has to happena crease of radius ρ strains its outer fibre by t ⁄ 2ρ, and a material takes less strain the more often it is askedcycles it must survivesmallest hinge radiusbest fold countpacking it reachesagainst once10.05087.643.8—100.15827.713.93× worse1000.5008.7604.38010× worse1,0001.5812.7701.38532× worsesheet 10, thickness 0.1, fatigue exponent 0.5 · the radius goes as N^0.5 and the packing as N^−0.5

What a second deployment costs

Every folded structure this field builds deploys once. The reason is a power law: a hinge asked to survive more cycles cannot be as sharp, a blunter hinge takes more surface out of the sheet, and the fold count that packs best falls as the cycle count to a fatigue exponent. A structure required to work a thousand times packs thirty times worse than one required to work once, and the exponent decides how fast rather than whether.

rigid · Deployables
what a finer pattern costs in confidenceeach hinge working 0.999 of the time, against a target of 99 per cent for the whole deploymenthingesthe system openseach hinge needssuccesses to show itand the article itself899.2%0.9987442,385cannot be tested2497.6%0.9995817,154cannot be tested6094.2%0.99983317,885cannot be tested12088.7%0.99991635,769cannot be tested30074.1%0.99996689,422cannot be testedr consecutive successes put a 95 per cent lower bound of 0.05^(1⁄r) on a hinge, and a flight article deploys once

The crease count is a reliability budget

A deployment that needs every hinge to work is the hinge reliability raised to the crease count, so the fineness that buys compaction spends the probability of getting it. At a thousandth of a chance of a hinge failing, sixty hinges give a 94 per cent deployment and three hundred give 74. The fold count that maximises expected compaction is well below the one that maximises compaction — and demonstrating the result takes tens of thousands of successful tests on an article that itself deploys once.

rigid · Deployables
one freedom, or severala stuck hinge or a failed actuator loses its own module and nothing elsemodulesall of it opensshare expectedat least 90%at least 75%173.3%73.3%73.3%73.3%272.6%85.2%72.6%72.6%570.4%93.2%70.4%96.0%1067.0%96.1%94.4%99.4%2060.6%97.5%98.7%100.0%5044.8%98.4%100.0%100.0%10027.1%98.7%100.0%100.0%300 hinges at 0.999 each, split evenly · each module's actuator works 0.99 of the time

Splitting a sheet buys area, not certainty

A folded deployable with one freedom needs every hinge and its one actuator, and three hundred hinges at 0.999 each open all the way 73 per cent of the time. Split the same hinges among ten separately driven modules and a stuck hinge costs only its own module: the share of the area expected to open rises to 96 per cent, and the chance of at least nine tenths of it rises to 94. The chance of all of it falls, to 67 per cent, because every freedom added is an actuator added. So freedoms, actuators and reliability trade in a definite way: one freedom is the best design only for a mission that is worthless without its whole area, and for any mission that can live with less, several freedoms win by a margin that no improvement in the hinges matches.

rigid · Deployables
tests needed for each layer of compaction, pattern by patterna test campaign grows with the hinge count, so the pattern with fewest hinges per layer is cheapest to trustpatternhingeslayersper layertests per layerby testsby lengthThe preliminary base88.01.002981st3rdThe Yoshimura pattern8660.01.434272nd1stThe waterbomb tessellation7631.52.417203rd2ndThe square twist123.03.981,1854th7thThe Miura fold389.24.121,2285th4thFold and cut — the triangle61.25.051,5056th6thThe tapered corrugation458.35.401,6117th5thThe hexagon twist183.35.541,6508th8thtests are consecutive successes demonstrating 99 per cent for the whole pattern at 95 per cent confidence

The pattern cheapest to trust

Demonstrating that a one-shot deployment will open takes a number of successful tests proportional to its hinge count, so the pattern that needs fewest tests for what it delivers is the one with fewest hinges per layer of compaction. That criterion is a count nobody computes, and computed on the printed shelf it ranks the patterns differently from crease length per layer: the preliminary base is first, at exactly one hinge per layer, and the square twist rises from seventh to fourth. As patterns are refined the difference sharpens. The waterbomb settles at 2.47 hinges a layer and the Yoshimura at 1.47, but the Miura climbs without levelling — 1.32 at two cells a side, 5.69 at eight — so every finer Miura costs more tests for each layer it adds, and the pattern that gets built is the only one of the three that gets dearer to trust as it gets finer.

rigid · Deployables
a 16 by 4 Miura cut along its zigzags into modules, folded and stackedslant 0.35; each module folds to its own box and the stacked modules share itmodulescolumns eachbox lengthlayers, stackedhingeshinges a layeractuators1166.55111.01089.791283.80819.71045.292442.43632.6962.954821.75048.3801.6681611.40764.0480.7516a cut removes one zigzag's hinges and adds one module to drive; the box and the hinges a layer both fall

A cut along the zigzag needs a tether

A Miura's folded stack walks along itself by the sine of its slant for every column, so a sheet cut along its zigzags into modules folds into boxes a fraction as long and stacks far deeper for the hinges. But the pieces cannot stay joined by a crease: a zigzag crossed by row creases is a line of four-crease vertices, and joined there the modules are the one Miura again. The join has to be a tether and every module its own actuator — and a cut, which removes a zigzag's worth of hinges, pays for itself in complete success only when an actuator fails less often than those hinges together.

rigid · Deployables
00.511.520.60.70.80.91failures crowded into one deployment in 10^xchance10 modules, share expected10 modules, at least 90%one freedom10 modules, all of it300 hinges at 0.999 each on average, actuators 0.99 · to the right, the same failures crowd into fewer deployments

Splitting insures only the failures that come alone

Three hundred hinges split among ten separately driven modules were found to open 96 per cent of their area on average against 73 for the same hinges as one mechanism. That gain rests on every hinge failing on its own. Let the same average failure rate arrive in a few bad deployments instead — a cold soak, a crushed stowage — and the one mechanism gains far more than its modules do, because a shared cause makes three hundred hinges behave like one. At one bad deployment in a hundred the lead is gone. A tether that passes a jam to its neighbour erodes it from the other side, and takes the chance of nearly all the area long before it takes the average. Neither touches the chance that everything opens.

rigid · Deployables

Named alongside it

The objects these essays reach for when they reach for this one.

DeploymentTrade-offActuationPacking ratioDegrees of freedomExpected-valueCrease radiusHingeMiuraDeployableIndependenceLayer count

All concepts